Tech Note 107 Detail

Updating linked calculations

Problem/Symptom:
In ScienceWorkshop I have a calculation that is used by a different calculation. When I changed my first calculation the second calculation did not change. What can I do?

PASCO Solution:
The calculations in Science Workshop are not automatically updated. To update the linked calculation, select it in the calculation window and click on the equal sign.

Creation Date: 01/1/2000
Last Modified: 01/1/2000
Mod Summary: