Tech Note 485 Detail

Synchronizing A Movie with Edited Data

Affected Products:

CI-6870 DataStudio, Single User

Problem/Symptom:
How do I synchronize a movie with manually-entered r edited data?

PASCO Solution:

This is not directly possible in DataStudio 1.9.8.2 or previous versions.

As a work-around, create an identity calculation (y = x), where x is the data that you want to synchronize. You can then synchronize the identity calculation.

Related Technotes:
TechNote 493 DataStudio Movie Synchronization

Creation Date: 05/5/2004
Last Modified: 06/2/2004